Maharashtra
State Energy Sector Achievement
|

|
| |
|
FIRST
SEB IN THE COUNTRY TO
- Commission a 10 MW set at Khaparkheda in 1950.
- Commission 1.2 MW Hydro unit at Radhanagari in 1951.
- Commission a 30 MW set at Paras in 1960.
- Commission a 62.5 MW set at Paras in 1967.
- Commission a 140 MW set at Nasik in 1970.
- Commission a 120 MW set at Koradi in 1974.
- Commission a 200 MW set at Koradi in 1978.
- Commission 60 MW Gas Turbine Unit at Uran in 1982.
- Commission a 500 MW set at Chandrapur in 1991.
- Introduce Bag Filter Technology in Thermal Plants to
bring down Pollution.
- Set up
a pilot project to extract ALUMINA from Fly-Ash at Koradi
ThermalPower Station with assistance of C.P.R.I., Bangalore.
- Commission 210 MW unit at Parli Thermal Power Station
in record time of 39 months instead
of 48 months
- Introduction of operating COST CENTER CONCEPT - a step
towards share market power sale.
- Commission
Khaperkheda Thermal Power Station Extension Stage II (2
x 210 MW) Unit 3&4 in 2001
|
|
|
|
|
|