Maharashtra State Energy Sector Achievement

 

FIRST SEB IN THE COUNTRY TO

  • Commission a 10 MW set at Khaparkheda in 1950.
  • Commission 1.2 MW Hydro unit at Radhanagari in 1951.
  • Commission a 30 MW set at Paras in 1960.
  • Commission a 62.5 MW set at Paras in 1967.
  • Commission a 140 MW set at Nasik in 1970.
  • Commission a 120 MW set at Koradi in 1974.
  • Commission a 200 MW set at Koradi in 1978.
  • Commission 60 MW Gas Turbine Unit at Uran in 1982.
  • Commission a 500 MW set at Chandrapur in 1991.
  • Introduce Bag Filter Technology in Thermal Plants to bring down Pollution.
  • Set up a pilot project to extract ALUMINA from Fly-Ash at Koradi ThermalPower Station with assistance of C.P.R.I., Bangalore.
  • Commission 210 MW unit at Parli Thermal Power Station in record time of 39 months instead of 48 months
  • Introduction of operating COST CENTER CONCEPT - a step towards share market power sale.
  • Commission Khaperkheda Thermal Power Station Extension Stage II (2 x 210 MW) Unit 3&4 in 2001

 