Maharashtra
State Energy Sector Achievement
|

|
| |
|
MSEB:
INNOVATOR ALL THE WAY
- First
S.E.B. to conduct successful on line mock trials for Y2K
compliance with all agencies in the state power sector vis.
Tata, BEST & BSES.
- It is
the first SEB to set up a 752 Kms. 500 KV HVDC system from
Chandrapur to Padghe.
- The only
SEB to have 400 KV Ring Main System linking 400 KV substations
for bulk power transmission.
- First
SEB with fully computerised Load Despatch Centres at Kalwa
and Ambazari with RTVS for data collection all over the
state for supervisory control and data acquisition (SCADA).
- First
SEB to introduce 'Time of Day' Tariff in 1997.
- Making
Maharashtra a leading state in Power Development. viz.
- Highest
installed capacity in the country: 15144 MW
-
Biggest Transmission and Distribution Network including
400 KV Lines
- 100
% Villages electrified in the state(1989)
- Energisation
of Highest number of Agricultural pumps (2327716) in
the country
-
Per Capita consumption : 667 KWH - (National Average
335 KWH)
|
|
|
|
|
|