Departmental Circular No.66 
(Commercial)


 
Scale "H"
(1) For an instruction and/or issue of a certificate under Rs.15
 rule 70(3) of the Indian Electricity Rules 1937
(2)
The fee shall be paid by the person who proposes either to erect anew building or structure or to make any temporary addition or alteration in or upon any building or a structure.
Scale "I"
(1) For inspection or examination of  
 any electric traction including

 trolley wires and overhead equip-

 ment and test or bonding and

 leakage currents.
Rs. 100 per day or part thereof.
(2) The fee shall be paid by the licensee or the owner of the electric traction system as the case may be.
Scale"J"
(1) For the testing of energy meters:-   
(a) For testing in the laboratory a single meter of any description.
(i) Upto a capacity of 50 amperes Rs.10
(ii) Of a capacity exceeding 50 amperes but not exceeding 200 amperes. Rs.1 5
(iii) Of a capacity exceeding 200 amperes but not exceeding 300 amperes. Rs.20

(iv)

Of a capacity exceeding 300 amperes but not exceeding 500 amperes Rs.35
(b) If a meter is to be tested on the consumer's premises, the fees
 prescribed in clause (a) shall be increased by Rs.5 per metec.
(2) The fee shall be paid by the owner of meter.    

 


Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved