| Alteration
to installation |
3) |
WHEREVER
any alteration is required by the Con-
sumer in the fixtures or position of fixtures.
Such alteration shall be carried out by the
Supplier at the Supplier at the entire
cost of the Consumer.
|
| Burning
hour Schedule |
4)
|
Allamps
fitted and in service shall burn eitther for
the
whose night or in accordance with the standard
moon
light schedule of the Supplier attached
hereto as Schedule
'B' or according to the convenience of the consumer
subject, however, to the minimum of 2300 burning
hours per annm and subjecct to the tariff
minimum prescribed in the tariff schedule
attached.
|
Switching
ON
& OFF. |
5) |
The
consumer shall make his own arrangement to
switch on and off the street lights. |
Replacement
of lamps |
6) |
The
supplier shall replace the burnt out lamps by
the
new ones, supplied by the consumer within reasonable
time after the receipt by the Resident Engineer
of written notice from the Consumer. The consumer
shall pay 10 paise per lamp for bulbs upto
60 Watts and 15 paise per bulbs of more than
60 Watts as handing ccahrges to the supplier.
|
| Charges
for Service |
7) |
THE
consumer shall pay to the supplier every month
at the office of the Resident Engineer or as
may be otherwise requereed, charges for
the service redered during the preeceding
month at the standard tariff of the
Board applicable for street lighting service
in force from time to time. If during the
currency of this agreement, tariff is revised,
increased or decreased tariff
from the date specified shalol apply to
the consumer during and for the unexpired
perriod of the present agreement.
A copy of the current tariff schedule applicalbe
to this Agreement is set out in Schedule 'A'
attached hereto.
|
Security
Deposit |
8) |
The
consumer shall pay Security Deposit against
payment of monthly bills in accordance with
the conditions
os supply of the Supplier.
|
Measurement
of energy
consumed
|
9) |
THE
Quantity of energy supplier to the Consumer
under this agreement shall be ascertained on
a meter or meters to be installed and maintained
by the supplier
at any place or places which may in the opinion
of the Chief
Engineer, Maharashtra State Electricity Board
(hereinafter referred to as "The Chief Engineer",
which expression shall include any other off
icer authorised by the supplier to perform the
functions of the Chief Engineer specified in
this Agreement and any other officer or officers
authorised by the Chief Engineer) be convenient.
If more than one meter is used, for separately
measuring the energy supplier for different
points the quantity of the energy supplied shall
be computed by adding the readings of all such
meters.
|