|
Industries, Energy & Labour Deptt.,
Mantralaya, Bombay - 400 032.
Dated:
the 1 st August 1980.
|
Bombay
Electricity
(Special
Powers Act, 1946) |
No. SAC-1979/4470/CR/NRG-2 - In exercise of the
powersonferred by clause (a) of Sub-section (1)
of section 6A
of the Bombay Electricity (Special Powers) Act,
1946, (Bom-Act, bay XX of 1946), and is supersession
of
Government Notification, Industries & Labour
Department, No. SAC-1074, the Government of Maharashtra
hereby directs
that no licensee supplying electrical energy in
the areas specified in Col.2 of the Schedule shall,
without
the previouss anction of the State Govt. supply
Electrical energy for industrial purposes to any
existing or new
consumers in these areas in excess of the
limits respectively specified against the said
areas in Col. 3 of the said
schedule.
|
SCHEDULE
| District |
Area |
Limits
of quantum of electrical.
|
| 1 |
2 |
3 |
|
Greater
Bombay
|
(i)
Area falling within Bombay Metropolitan Region
(i.e.B.M.R.) as defined in Schedule I to the
Bombay Metropolitan Region Authority Act, 1974
Extract
published as an accompaniment
(ii)
Areas falling outside B.M.R.
|
Upto
100 kW connected load inclusiveof existing load,
if any.
|
|
Thane
|
-do-
|
-do-
|
|
Kolaba
|
-do-
|
-do-
|
|
Pune L/13175/Mdt. 29.5.68
|
(i) Area falling within Pune Metropolitan Region
as defined in Govt. Notification U.D. and P.H.D.
No. RPP-1067/10963/M,
dt. 7.7.67
and No. RPP-1068 (Notification
reproduced as
accompaniment)
|
Upto 100 kW connected load inclusive of existing
load, if any.
|
|
(ii) Area falling outside P.M.R.
|
Upto 500 kW connected load inclusive of existing
load, if any
|
|
Ratnagiri, Nashik, Dhulu, Jalgaon, Ahmednagar,
Satara, Sangli, Solapur, Kolhapur, Aurangabad,
Parbbani, Beed, Nanded, Osmanabad, Nagpur,
Buldana, Akola, Amravati,Yavatmal,
Wardha, Bhandara, Chandrapur.
|
EntireArea
|
Upto 500 kW connected load inclusive of existing
load, if any.
|
Explanation:
For the purpose of this Order:-
| (a) |
"existing
consumer" means a consumer who was receiving
electrical energy from any licensee immediately
before the date of this Order; |
| (b) |
"new
consumer" means a consumer who was not receiving
any supply of energy from any licensee immediately
before the date of this order.
|
By
Order and in the name of the Governor of Maharashtra.
|