Departmental Circular No. 382
          
The Executive Engineer of the concerned area would be responsible to bring to the notice of the circle incharge the difficulties of the consumers in such areas where the facilities fordistribution and transformation may have to be created or augmented.


H.T. Consumers

In case of all H.T. industrial consumers, the circle heads should look into each individual case and sanction power to the extent he is competent without any delay. The consumers should be suitably guided regarding furnishing details in the prescribed proforma specified for sanction of the load and also in respect of any other related matter and the applications processed suitably, wherever required as per rules. All the applications should be forwarded to the Chief Engineer (Com.) under intimation to the concerned Zonal Chief Engineer. In cases where large loads of more than 500 kVA are being recommended to be fed from existing facilities, this may be done under intimation to Zonal Chief Engineer and Chief Engineer (Dist.) for their information. In respect of the other cases where facilities may have to be created, the Zonal C.E. and C.E. (Dist.) should offer their comments to C.E (Com.) on the proposal made by the circle head within a period of one month at the most. If this is not done, it will be presumed that the scheme proposed by the circle head is acceptable to them and further action would be taken accordingly. The circle heads should pursue with the concerned competent authority for approval of the scheme and also arrange for materials and execution of the work on receipt of the materials by getting necessary formalities completed from the consumers.

In case where supply could be given by normal extension of the existing lines, the circle incharge in case of H.T. consumers should decide the amount to be recovered from the consumer for giving the suppply and only in cases where the load applied for is large and additional sub-station facilities have to be created for transmission & transformation the commercial arrangements are to be made by the commercial section after finalising the scheme in consultation with C.E. (Trans. PI) and C.E. (Dist.) as the case may be.

While on the subject, attention of the C.E./Dy. C.E., S.E. & E.E. is invited to the following relevant aspects of the process of the sanction of power which have already been communicated to them in the past




1.

2 copies of the applications requiring load sanction from the Govtshould be forwarded to the concerned Industries Department as already instructed vide our circular dt. 10.2.83

2.

Consumers in BIVIRD area should be guided properly to submit applications for NOC/LC to the Industries Department as instructed in our circular dt. 18.7.83.

3.

Remarks of the circle/zonal office should invariably be clearly brought out in the recommendation sheet as advised in our recent circular dt. 13.1.84.

4.

The Board has already committed to process and sanction the power supply and also release connections to the H.T. & LT. consumers within a specified time. These time limits have been indicated to you vide Circular No. P-Con/40765 dt. 7.9.83 As already stated therein the sanction for power supply to the L.T. consumers should be accorded within a time limit of two months and that for H.T. connection within a period of three months and the connection or release of power should be given within a period of three months after the completion of all the formalities.

In view of the above detailed revised instructions, the procedure laid down undergeneral circular No. 64 issued by C.E. (Dist.) vide letter No. P S A C 6/Gen/29783 dt. 30.6.83 will stand modified as above.

The above instructions are being issued with the approval of the Chairman.
 

 


Sd/-

C.E. (Comm.)

Back
Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved