No. PR-3/44871 dt. 30 OCT. 1985 Maharashtra State Elect. Board, 3rd floor, Hongkong Bank Bldg; Fort, Bombay 400023. .

 

Departmental Circular Commercial No. 394

Sub  : 

Billing of consumers - Installation of correct meters.

The importance of billing the consumers on the basis of the readings recorded by meters working within the limits of the errors prescribed by the Indian Electricity Rules 1956 need not be stressed again. In case the readings recorded by meters installed in the premises of the consumers are beyond the above limits, such readings will be treated as incorrect and billing for the energy consumed has to be done on the basis of average consumption. However, as per provisions of the Indian Electricity Act 1910, where a dispute regarding accuracy of meters arises, and the matter is referred to the Electrical Inspector for decision, the Board is entitled to claim bills on the basis of Electrical Inspector's decision for a period of not more than 6(Six) months. Therefore, it will not be possible for the Board to recover charges for energy supplied if correct meter is not installed within the above period, and the recovery of any chargesbeyond the six months period may not be tenable on account of such disputes. Therefore it is imperative that the Board ensures recording of energy consumption by appropriate meters working within permissible limits of error if it is not to lose the revenue due to it.

You are requested to ensure that proper arrangements are made to install, maintain and replace meters in time in consumer's premises within permissible limits of error.

In case new meters are required for this purpose, the same may be taken up with T.D. (Stores) and T.D. (Distribution) as the case may be.
 

Sd/-
TECHNICAL MEMBER.


Back
Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved