  No. P-Com/25899
Maharashtra State Elect. Board, Prakashgad,
Bandra (East),
Bombay-51

Date: 25.7.1988
  
 

  Departmental Circular (Com) No. 437
 
Sub :
  

Clearance required to be obtained by powerlooms for availing supply.
  

Ref :
1) Govt. Letter No. MSC/1 084/2872/CR/NRG-2/ Dt. 30.10.84 and subsequent Modifications.
  2) Dept. Circular (Comm.) No. 387 Dt 28.11.84
  3) Govt. letter No. MSC/1 087/CR/2184/NRG-5/ dt 15.6.88.

 

............Government of Maharashtra vide letter No. MSC/1 084/2872/CR/NRG 2 Dt. 30.10.84 has prescribed a list of the NOC / clearance required to be obtained by various types of consumers before alailing power connection. This was circulated to all concerned vide Dept. Circular (Comm.) No. 387 Dt. 28-11.84.

............In partial modification of this directive, the Govt. has now decided that the Sr. No.3 of the said order regarding N.O.C. for 'powerlooms' shall be substituted by the list now issued vide Govt. letter No. MSC/1087/ CR/2184/NRG-5 dtd. 15.6.88. A copy of the Govt. letter Dt. 15.6.88 alongwith the list is enclosed herewith. Therefore list of NOC shown against Sr. No 3 of the list issued vide Govt. letter dt. 30.10.84 now needs to be substituted by the above and followed while sanctioning power to powerlooms.
  

Sd/-
Chief Engineer (Com)


Back
Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved