............Various
'C' class Municipalities have represented to the Board
as well as the State Government requesting that they
may be billed at the concessional tariff which is
being made applicable to the Rural Drinking Water
Supply Schemes and also to exclude the stand by motors
installed by them from the total connected load for
the purpose of billing. While their request for application
of concessional tariff has not been acceded to, their
request for exclusion the load of the standby motor
from the connected load has been agreed to and the
Board vide B.R.No. 1289 dated 12.1.1989 has approved
as follows:
............"If
the water supply scheme of 'C' class Municipalities
has a standby motor connected with another motor with
a double throw change over switch approved by the
Board, then relief should be given in billing to the
Municipalities by excluding the load of the standby
motor while computing the connected load for the purpose
of billing w.e.f. the billing month of January 1989".
All
concerned are requested to bring this to the notice
of all the 'C' class of Municipalities in their jurisdiction
so as to enable them to take action for installation
of suitable double throw switch, if already not installed,
and to avail the facility of excluding the load of
standby motor for computing the connected load for
the purpose of billing.
|
Sd/-
|
|
Chief
Engineer (Commercial)
|
|