Office of the Technical Director
(EHVP –COM)
Maharashtra State Electricity Board
“Prakashgad”, Bandra (East), Mumbai
-400051.
Tel.:(P) 26474753 (O) 26474211 Fax: (022) 2642366
REF.: PR – 3 / TARIFF /08229 DATE: 21/03/2003
DEPARTMENTAL CIRCULAR (COMMERCIAL) NO. 674
Subject: Determination of Billing Demand
in respect of High Tension & Low Tension consumers ---- Clarification thereof.
Immediate attention is invited
to the letter no. PR – 3 / Tariff / 3975 dated 06/02/2003. It is once again
to inform all the concerned that:
a)
The demand recorded during 2200 hrs to 0600 hrs by a High Tension
consumer as well as Low Tension consumer who has opted for LT MD tariff, irrespective
of whether the same exceeds his Contract Demand or otherwise, will be ignored
for determination of Billing Demand,
b)
However, the consumer exceeding Contract Demand shall be billed
penalty as per the prevailing provisions i. e. at the rate of 50% of the prevailing
Demand Charges and such penalty will be charged only on the Demand in excess
of the Contract Demand,
c)
Further, the consumers exceeding Contract Demand shall also be
liable to pay the SLC as per the provisions of Condition No. 31 (f) (i).
Now, the Hon’ble Commission by its Order dated
04/02/2003, has inter – alia further directed that:
(I)
The guidelines / instructions as above will be with effect from 01/05/2000
i. e. the effective day of the first tariff Order passed by the Hon’ble Commission,
(II)
All such pending disputes / appeals in respect of determination of Billing
Demand on the basis of the Demand recorded during night hours will be settled
and refund, if any, will be given to the consumer, without interest, provided
the same are cleared before 31/03/2003.
All the concerned
Field Officers should therefore note the further guidelines / instructions as
above and should ensure that all pending disputes / appeals in respect of determination
of Billing Demand are settled within the prescribed time limit.
TECHNICAL DIRECTOR
(EHVP - COM)
|