16.
Extension and alteration :
Should the consumer at any time
after the supply of energy has been commenced, desires to
increase the number of size of iights, fans, motors, etc.
on his premises or in any way to alter the position of his
wiring therein, notice thereof shall be sent in writing to
the Board whose representative will call and inspect the alteration
and, if necessary change the meters and fuses and alter the
service line. A test report signed by his wiring contractor
shall be submitted by the consumer and the cost of the alterations
to service line shall also be borne by him. Failure to give
such a notice may derange the supply system and will render
the supply liable to be summarily discontinued. During such
time as alterations, additions or repairs are being executed
the supply to the circuit which is being altered, added to
or repaired must be entirely disconnected and it shall remain
disconnected until the alterations additions, or repairs have
been tested and passed by the Board.
17.
Defects in consumer's installation :
In the event of any defects
discovered in the consumer's wiring or apparatus connected
to the system of any earth leakage on any section of consumer's
circuit or apparatus, the consumers shall in the absence of
the employees of the Board, disconnect the same forthwith
and notify the same to the Chief Engineer and shall not reconnect
the same except with the consent of the Board and alter the
defect/defects is/are removed, and the Board reserves similar
rights to disconnect, should the defect come to its notice
earlier.
|