c) |
Where
the consumer has no frontage abutting a public street,and
where the service line has necessarily to cross over
or go under or through other property, the consumer shall,
if so required by the Board, obtain the necessary way leaves
and premission at his own expense, and continue them
as long as supply is to be maintained. Should, however
the way leaves or premission be withdrawn, the supply will
be cut off forthwith. Any extra expenses incurred in laying
the service line, maintaining the same in accordance
with the way leaves shall be at the expense of the consumer.
|