30.

General wiring conditions :



g)

Domestic Heating and Cooking :

 

A special circuit for heating and cooking wherever necesary shall be run from the Board's point of supply. Wall plugs used on these circuits shall be of the concentric type or three pin type, the third pin connected to 11 earth". Two pin plugs or lighting sockets shall not be allowed.

h)

Plugs :

 

All plugs shall be switched on the live wire and not on the neutral.

i)

Wiring :

 

Wiring Single leads shall not be allowed to be run separately in iron conduit.

j) General Wiring Condition :

i)

A. C. Motor Installation - Motors shall be provided with control gear so as to prevent satisfactorily the maximum current demand from the consumer's installation exceeding the limit given in the following schedule at any time under all possible conditions. Failure to comply with these regulations will render the consumer liable to disconnection from the supply on account of the interference with the supply to other consumers.


NATURE OF SUPPLY

SIZE OF INSTALLATION

LIMIT OF MAXIMUM CURRENT DEMAND

Single Phase

Upto and including 1 H.P.

6 x full load current

Three Phase Upto and including 3 H.P.
3 x full load current
 

Above 3 H.P. and upto
and including 10 H.P

2 x full load current

 

Above 10 H.P & utpo
and including 50 H.P.

1.5 x full load current

 

Above 50 H.P.

1.25 x full load current

     Motors of above 1 H. P. shall be wound for 3 phase, 400 volts between phases.


In the case of major schemes the following relaxation in the starting current for three
phase motors may be permitted.

SIZE OF INSTALLATION

LIMIT OF MAXIMUM CURRENT DEMAND

 

Upto and including 3 H. P 

6 x full load current

 

Above 3 H. R and upto and
including 20 H.P

2 x full load current

 
Above 20 H. P. and upto and
including 50 H.P.
1.5 x full load current
 
Above 50 H.P.
1.25 x full load current
 


Back
Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved