| 4. |
Service lines : |

|
| h) |
If
after commencing the service a consumer requires an additional
load and if for the supply of additional power, the service
requires to be strengthened, the entire cost of such strengthening
shall be borne by the consumer on the basis of the cost plus
15% for supervision.
|
| i) |
Where
in any area in which no supply facility is existing and for
which a scheme is in force or is to be framed it sufficient
number of applications for supply are received together, with
cost of providing facilities for such supply, the Board may
sanction electrification of such area on compliance by the applicant
or the intending consumer with the terms and conditions as may
be prescribed by the Board. The sanction and implementation
of the scheme will be decided by the Board at its own discretion
where sufficient number of applications as provided above are
available together with the finances from other sources and
the Board considers the shceme viable. In case the scheme does
not become viable the said applications shall be treated as
cancelled and the amounts recovered shall be refunded. In having
such schemes the Board reserves the right to vary the terms
and conditions to be prescribed having regard to the class of
consumers or the economic conditions prevailing in the area.
|
|
* Modified
vide B. R. No. 891 Dt. 20-4-1978
|
|
|
|