| 5. |
Service
line charges - Low tension permanent supply other than
agricultural pumping loads :

|
| |
b)
Underground Service Line :
i) Where Board's overhead distribution
system exists, the actual cost of material anc labour plus
15% to cover overhead charges.
ii)
Where Board's underground distribution system exists. Same
as in (i) above unlesE any separate scale of charges are prescribed.
The
service connection charges are payable in advance for the
overhead servicE lines at the rate prescribed at (a) above
and for underground services in case of be above on an estimated
basis, subject to adjustment on completion of the work or
the basis of actual cost plus 15%.
The
service line shall be normally laid ovehead where Board's
overhead distributior system exists. Underground service line
may be provided (where Board's overhea( distribution system
exists) at the discretion of the Board only where the condition,,
so warrant.
**
" The service connection charges for extending ovehead
or underground power suppl, should not be recovered from backward
class consumers. i. e. schedule caste schedule tribes nomadic
tribes, denotified tribes (Vimukta Jaties) and Nav Budha!
for Domestic light and fan connections. Wherever there are
multistoried buildings complexes having both backward class
and non-backward class consumers thl prorata service connection
charges due from backward class consumers shall onl, be exempted
from payment."
|
| |
c)
Two phase service connection would be charged as for 3 phase
supply :
Note :
1
. Variable charge is leviable only for that portion of the
overhead line which is in excess of 30 metres which is allowed
free of cost to the consumer including the portion in ffi
consumer's premises.
*2. The variable charges include the cost of any pole
other than the terminal pole whic may have to be installed
beyond. 7.5 metres of the consumer's premises. Terminal pol
when required i. e. when the overhead service line cannot
be terminated on the structur of the consumer and it becomes
necessary to install a pole will be charged at th rate of
Rs. 500/- per PSC pole and at the rate of Rs. 1200/- per RSJ
pole which charge includes the cost of pole, erection and
supervision charges.
3. The overhead service connection charges shown above
include the cost of that portio of the service line laid on
the consumer's premises in G. 1. Pipe or conduit and/or on
wooden batten, from the overhead terminal point of the service
line at the frontage of the premises upto the meter board.
4.
a) Where a service connection is already provided on a buildig
and other tenants in th same building want to have independent
connection as seperate and direct consumei of the Board, the
service connection will be provided by tapping the existing
servic in accordance with condition 11 (d) hereof and the
charges payable will be as under.
|
|
*
Modified vide B.R. No. 514 Dt. 29-5-1990.
**Modified vide B.R. No. 147 Dt. 1-7-95.
|
|
|
|