7.
Service line charges for high tension/extra high tension supply
ii)
If a consumer desires supply of small quantum of power for
purposes of construction of his factory before going into
regular production, the Board may allow this facility on condition
that he executes a separate agreement for supply of construction
power and at the same time another agreement for supply of
power for regular production purposes.
The period of agreement for
construction power shall be 7 years from the date of commencement
of supply or till the date of commencement of supply for regular
production purposes, whichever is earlier. The period of agreement
for regular supply, shall be 7 years from the date of commencement
for regular production purposes.
In
the case of the consumers where the supply is given for construction
power f rom the same line as laid for subsequent regular supply,
they may be allowed the facility of not being required to
pay for the minimum gurantee based on 20% return during the
construction period.
The
supply of construction power shall be governed by the condition
7 (i) above.
iii)
Where a consumer requires supply at High Tension purely on
temporary basis for any project construction or similar other
purpose, the Board may subject to availibility of power give
such temporary supply on the following conditions :
a)
The period of agreement to be executed shall be as required
by the consumer.
b)
The consumer shall pay in advance the full cost of providing
the facility of electric supply.
c)
The amount so paid shall be adjusted on completion of the
agreement when the consumer would be allowed a credit for
the cost of the line after deducting for the dismantling charges
including 15% for supervision and after allowing for depreciation
for the materials and equipments at the rate at 25% of the
original cost for the first year or part thereof and 1 % for
each subsequent month or part thereof. Such consumers would
not be required to pay any minimum guarantee charge except
the tariff minimum during the period of the contract.
iv) Standard tariffs as prescribed by the Board from time
to time applicable to similar class of consumers would apply
for supply in the cases (ii) and (iii) above.
*v)
Every High Tension / Extra High Tension Consumer shall pay
the following (non refundable) fixed service connection charges
over and above the amount to be paid as per condition 7 (i)
for new loads demanded by him and in case of additional load
only to the extent of the new demand i. e. excluding load
already connected.
* Added
Vide B. R. No. 155 Dt. 24-6-1972
|