8.
Extension of Board's lines :
The
Gross revenue of 20% is prescribed for considering new electrification
schemes or extensions of existing lines as is economical under
various schemes.
9.
Point of supply :
Unless
otherwise agreed to, the point of supply shall be at the outgoing
terminals of the Board's cutouts fixed after,
1) Meters
in the case of L. T consumers.
2) Control switchgear
that may be installed in consumer's premises under condition
11 (a) hereunder.
10.
Supply at high tension :
A consumer requiring high tension
bulk supply must provide and maintain at his expense a locked
and weatherproof enclosure of a design to be approved by the
Board purpose of housing the Board's terminal high tension
switchgear and metering equipment. Such enclosure may also
be used by the consumer for housing his own H. T. switchgear
transformer and other apparatus with the written permission
of the Board but such enclosure shall not be used for any
other purpose. The Board shall have access to the enclosure
at all times without notice for purpose of inspecting, testing
and maintenance of the Board's apparatus :
|