8. Extension of Board's lines :

     The Gross revenue of 20% is prescribed for considering new electrification schemes or extensions of existing lines as is economical under various schemes.

9. Point of supply :

     Unless otherwise agreed to, the point of supply shall be at the outgoing terminals of the Board's cutouts fixed after,

1) Meters in the case of L. T consumers.

2) Control switchgear that may be installed in consumer's premises under condition 11 (a) hereunder.

10. Supply at high tension :

     A consumer requiring high tension bulk supply must provide and maintain at his expense a locked and weatherproof enclosure of a design to be approved by the Board purpose of housing the Board's terminal high tension switchgear and metering equipment. Such enclosure may also be used by the consumer for housing his own H. T. switchgear transformer and other apparatus with the written permission of the Board but such enclosure shall not be used for any other purpose. The Board shall have access to the enclosure at all times without notice for purpose of inspecting, testing and maintenance of the Board's apparatus :

 


Back
Table Of Contents
Next

| ABOUT MSEB | CONSUMER SERVICES | SUPPLIER SERVICES
| POWER PROJECTS |
| CONTACT US | HOME | SITEMAP
| ENGLISH | MARATHI |

Copyright © 1999-2000 MSEB, All Rights Reserved