| A) |
|
Single
phase supply upto 5 KW |
|
|
ii) |
Service
Connection Charges |
|
|
1. |
Fixed
Service Connection charge |
Rs
100/- |
|
2. |
Rental
charge of Rs 10/- per metre of the line up to the metering point
for the the first month or part thereof
and Rs 3/-per metre for each subsequent month or part thereof |
|
iii) |
Energy
Charges and Minimum Charges shall be as prescribed in the Tariff
in force |
|
|
iv)
|
Security
Deposit |
Rs.
1000/- for a period of 3 days |
|
|
|
Rs
3000/- for a period of 30 days |
| B) |
|
Three
phase supply for connected load more than 5 KW and Cinemas |
|
|
iii) |
Energy
Charges and Minimum Charges shall be as prescribed in the Tariff
in force |
|
|
iv)
|
Security
Deposit |
Rs.
3000/- for a period of 3 days |
|
|
|
Rs
10000/- for a period of 30 days |
| 3. |
i) |
Installation
Testing fees to be recovered under condition (15) |
|
|
a) |
Low
Tension service |
|
|
1.
|
Single
Phase |
Rs.
25 /- |
|
2. |
Three
phase |
Rs.
50 /- |
|
b)
|
High
Tension Service |
Rs.
200/- |
|
|
|
|
|
ii) |
Reconnection |
|
|
a) |
Low
Tension service |
|
|
|
At
cut out |
|
|
1.
|
Single
Phase |
Rs.
15/- |
|
2.
|
Three
phase |
Rs.
30/- |
|
|
At
overhead mains |
|
|
1. |
Single
Phase |
Rs.
25 /- |
|
2. |
Three
phase |
Rs.
50 /- |
|
|
At
underground mains |
Rs.200
/- |
|
b) |
High
Tension Supply |
Rs.300
/- |
|
c) |
If
a consumer is reconnected within 12 months from the date of
last reconnection, 50% will be added to the foregoing charges. |