| *4. |
Meters

|
| *b)
|
Changing
or moving a meter board
|
Actual
cost plus 15% |
| c) |
For changing meter only at the request of the consumer
where it is not necessitated in consumption and demand
permanently |
Rs.
15/-
|
| *d) |
Testing
of meter, if it should be proved to be correct within
the limit laid down by the rules. |
| 1 |
Single phase meter |
Rs.
15/-
|
| 2 |
Poly
phase meter |
Rs.
75/-
|
| 3 |
Demand or special type of meters |
|
| i) |
LTMD (with or without CTS) |
Rs.
200/-
|
| ii) |
Trivector
meter |
Rs.
200/-
|
| iii) |
RKAVH meter |
Rs.
75/-
|
| *e) |
Reasealing
charges (if seals found broken). |
| 1) |
MD
indicator |
|
| 2) |
Cutouts
|
|
| 3) |
Instruments
of the Board |
Rs.
20/-- per seal
|
| 4) |
Meter |
|
| f) |
Repairs/Servicing
charges for energy meters in additionConcerned EE
to decide to testing charges. |
|
As
follows :-
Actual
cost of components.
Actual
cost of labour.
15%
supervision on both.
|
| g) |
Replacement
of meter card found to be missing on consumer's premises.
|
Rs.
1/-
|
| *h) |
Service
charges during testing of the metering equipment of
HT consumers. |
|
| 1) |
Replacement
of fuses |
|
| 2) |
Proper
setting of loose PT connections
|
Rs.
70/-
|
*Modified
Vide B.R. No. 514 Dt. 28-5-1990
|
|
|