| *5. |
Service
Calls:
|
| a). |
Charge
for attendence of fuseman where the failures of supply
is due to a fault in the consumer's installation.
|
| i) |
for
Low Tension consumers |
Nil
|
| ii) |
for
High Tension consumers |
Rs.
100/-
|
| |
Replacement
of fuse on one phase |
Rs.
150/-
|
| |
Replacement
of fuse on three phases |
Rs.
200/-
|
| b) |
Charge
for attendence of fusemen at consumers premises during
any function (maximum 6 hours) |
Rs.
100/-
|
| **6. |
Security
Deposit against payment of monthly energy bills :
|
|
When
required by the Board to do so the consumer shall
deposit security amount which shall be approximately
equivalent to 3/4/6/8 months estimated bills in the
consumer's premises in respect of month ly/b i- monthly/
quarterly/half yearly billed consumers respectively
and in no case be less than Rs. 30/- or Rs. 40/- or
Rs. 60/- per 0.5 KW connected load for the lighting
installation in respect of monthly/bi-monthly/quarterly
billed consumers respectively and Rs. 75/- or Rs,
100 or Rs. 150 per HIP connected load for motive power
installation in respect of monthly/bi-monthly/ six
monthly billed consumers respectively. The I-T Industrial
consumers shall deposit security deposit equivalent
to two months bill. The Board further directs that
on this basis the SD should be recovered from the
existing consumers. However, in case if there is excess
SD (i. e. more than 2 months bill) no refund should
be given.
|
| 7. |
Miscellaneous
Work:
|
|
The
charges payable in advance for any work which the
Board may undertake for the consumer and which is
not included in the forgoing schedule, shall be the
actual cost of labour and materials plus 15 percent
to cover overhead charges, Estimate will be submitted
when necessary.
|
| i). |
The
hire charges for the capacitors if provided by the Board
shall be recovered as given.
|
Rs,
3/- per kVAR
per month
|
| ii). |
Testing
of L. T capacitors (at Board's Testing unit) |
Rs.
50/- per capacitor
|
*Modified
Vide B.R. 514 Dt. 28-5-90
|
|
|