| MAHARASHTRA STATE POWER GENERATION
COMPANY LIMITED |
|
|
|
|
|
| NASHIK THERMAL
POWER STATION |
|
|
|
|
|
| DETAILS OF
TENDER FOR SALE, SUBMISSION AND OPENING |
|
|
|
|
|
| SR. NO. |
TENDER SPECIFICATION NUMBER |
WORK DISCRIPTION |
SALE PERIOD |
DUE DATE OF BID SUBMISSION AND OPENING TIME |
TENDER ADVERTISEMENT
DETAILS REFERENCE |
RELEVANT DETAILS FOR PROPOSECTIVE
BIDDERS (COST
OF TENDER DOCUMENT/ESTIMATE/EMD/ PRE-QUALIFICATION REQUIREMENT) |
|
|
|
|
|
| 1 |
CE(GN.O&M)/NTPS/ |
DESIGN,
MANUFACTURE, SUPPLY AND |
8/12/2005 |
8/25/2005 |
N-09/2005/7860 |
TENDER DOCUMENT
COST = RS. 1,125/- |
|
|
|
|
|
| |
DY.CE-I/BM/2005/27 |
INSTALLATION OF EROSION CONTROL
SYSTEM |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.14.59 LAKHS |
|
|
|
|
|
| |
|
AFTER CONDUCTING CAVT FOR 140 MW
UNIT-2 |
8/24/2005 |
|
|
EMD = RS.14,588/- |
|
|
|
|
|
| |
|
BOILER OF NTPS, EKLAHARE. |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 2 |
CE(GN.O&M)/NTPS/ |
WORK CONTRACT FOR REMOVAL,
COLLECTION, |
8/12/2005 |
8/26/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 2,250/- |
|
|
|
|
|
| |
DY.CE-II/PLANNING/ |
LOADING, TRANSPORTING
& UNLOADING FOR |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.30.88 LAKHS |
|
|
|
|
|
| |
2005/28 |
COAL MILL REJECT, RCF COAL AND
ASH FROM |
8/24/2005 |
|
|
EMD = RS.30,880/- |
|
|
|
|
|
| |
|
UNIT-3,4&5 AT NTPS EKLAHARE. |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 3 |
CE(GN.O&M)/NTPS/ |
ANNUAL SERVICE/MAINTENANCE
CONTRACT |
8/12/2005 |
8/29/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 338/- |
|
|
|
|
|
| |
DY.CE-II/TM-II/2005/29 |
OF PCR AC PLANT AND CHILLER PLANT
AC |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.04.16 LAKHS |
|
|
|
|
|
| |
|
COMPRESSORS &
SYSTEM OF U-3,4&5; ESP |
8/24/2005 |
|
|
EMD = RS.
4,160/- |
|
|
|
|
|
| |
|
CONTROL OF U-4&5 PAC &
U-3 ESP VENTILATION |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
VENTILATION SYSTEM ETC. AT
NASIK TPS, |
|
|
|
|
|
|
|
|
|
| |
|
EKLAHARE. |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 4 |
CE(GN.O&M)/NTPS/ |
ANNUAL WORK CONTRACT FOR
SERVICING OF |
8/12/2005 |
8/30/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 1,125/- |
|
|
|
|
|
| |
DY.CE-II/CHP/2005/30 |
BEETLE CHARGER AND OTHER
AUXILIARIES |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.10.14 LAKHS |
|
|
|
|
|
| |
|
AT CHP NASIK TPS, EKLAHARE. |
8/24/2005 |
|
|
EMD = RS.10,140/- |
|
|
|
|
|
| |
|
|
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 5 |
CE(GN.O&M)/NTPS/ |
ANNUAL WORK CONTRACT FOR
SERVICING OF |
8/12/2005 |
8/31/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 1,688/- |
|
|
|
|
|
| |
DY.CE-II/CHP/2005/31 |
CONVEYORS AND OTHER EQUIPMENTS IN |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.16.49 LAKHS |
|
|
|
|
|
| |
|
CHP-II AT NASIK TPS, EKLAHARE. |
8/24/2005 |
|
|
EMD = RS.16,490/- |
|
|
|
|
|
| |
|
|
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 6 |
CE(GN.O&M)/NTPS/ |
CONSTRUCTION OF UCR MASONARY
RETAINING |
8/12/2005 |
9/1/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 1,125/- |
|
|
|
|
|
| |
DY.CE-II/CIVIL/2005/32 |
WALL FOR PROTECTION OF CONROL
ROOM, |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.13.34 LAKHS |
|
|
|
|
|
| |
|
CABLE TRENCH, F-7 TRANSFORMER,
CONVEYOR |
8/24/2005 |
|
|
EMD = RS.13,341/- |
|
|
|
|
|
| |
|
NO.2 & PENT HOUSE AT
CHP-I,NTPS,EKLAHARE. |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 7 |
CE(GN.O&M)/NTPS/ |
ANNUAL CONTRACT FOR MAINTENANCE
OF |
8/12/2005 |
9/2/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 563/- |
|
|
|
|
|
| |
DY.CE-II/CIVIL/2005/33 |
GARDEN & PLANTATION OF
VARIOUS LOCATIONS |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.06.16 LAKHS |
|
|
|
|
|
| |
|
LOCATION IN COLONY & POWER
HOUSE |
8/24/2005 |
|
|
EMD = RS. 6,162/- |
|
|
|
|
|
| |
|
PREMISES AT NTPS, EKLAHARE. |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 8 |
CE(GN.O&M)/NTPS/ |
DISMENTLING OF EXISTING DAMAGED
M.S. |
8/12/2005 |
9/3/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 563/- |
|
|
|
|
|
| |
DY.CE-II/CIVIL/2005/34 |
WATER STORAGE TANKS &
PROVIDING & FIXING |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.09.94 LAKHS |
|
|
|
|
|
| |
|
PVC SINTEX WATER STORAGE TANKS AT
TOP/ |
8/24/2005 |
|
|
EMD = RS. 9,943/- |
|
|
|
|
|
| |
|
OVER ROOF SLAB OF VARIOUS
MULTISTORIED |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
BUILDINGS AT NTPS COLONY,
EKLAHARE. |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 9 |
CE(GN.O&M)/NTPS/ |
PERIODICAL CLEANING OF INLET
SUMPS OF |
8/12/2005 |
9/14/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 563/- |
|
|
|
|
|
| |
DY.CE-II/CIVIL/2005/35 |
ETP PUMP HOUSE I & II SETTLER
TANKS AS & |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.07.86 LAKHS |
|
|
|
|
|
| |
|
WHEN REQUIRED, SETTLER TANKS, |
8/24/2005 |
|
|
EMD = RS. 7,860/- |
|
|
|
|
|
| |
|
CONNECTING DRAINS ETC. AT NTPS,
EKLAHARE. |
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 10 |
CE(GN.O&M)/NTPS/ |
SUPPLY OF CROMPTON/PHILIPS/BAJAJ
MAKE |
8/12/2005 |
9/15/2005 |
N-09/2005/7860 |
TENDER DOCUMENT COST =
RS. 1,125/- |
|
|
|
|
|
| |
DY.CE-II/EM/2005/36 |
GLS/HPMV/HPSV LAMPS, TUBE RODS
COPPER |
TO |
15=30 HRS. |
DT. 03-09-2005 |
ESTIMATE = RS.11.19 LAKHS |
|
|
|
|
|
| |
|
BALLAST, FIXTURES ETC. AT NTPS,
EKLAHARE |
8/24/2005 |
|
|
EMD = RS.11,190/- |
|
|
|
|
|
| |
|
|
|
|
|
PRE-QUALIFYING CRITERIA = -- NIL -- |
|
|
|
|
|